What size waste-to-energy plant does a city need?
Short answerPlant size follows the annual waste volume, the waste mix and which product lines are added. Nullogen plants are modular, built from reactors of at least 5 tonnes per hour. A 120,000 t/year plant serves about 330,000 people and a 400,000 t/year plant about 1.1 million. Engineering and construction take about 24–26 months.
Three plant configurations
| Parameter | 120,000 t/year | 400,000 t/year | 600,000 t/year |
|---|---|---|---|
| Sorting | Without pre-sorting | With pre-sorting | Pre-sorting and organics line |
| People served | 330,000 | 1.1 million | on request |
| Power | 13.5 MW electric | 19.5 MW electric | 98.4 MW energy output |
| Footprint | 5 ha | 10 ha | on request |
| Engineering and construction | 24 months | 26 months | on request |
| Products | Energy, slag | Energy, slag, baled recyclables | 72,900 t slag, 18 M Nm³ biogas, 66,000 t fertilizers a year |
What determines the plant layout?
- Capacity and number of reactors. Plants are modular: two or more reactors of at least 5 t/h each run side by side.
- Waste mix. Hazardous, medical and industrial streams affect the gas cleaning and handling equipment.
- Product lines. Pre-sorting, digestion, composting and fermentation add product streams: recyclables, biogas, bioethanol and fertilizers.
- Energy use. Grid connection for electricity, and district heating in cold regions.
- Oxygen supply. The oxygen station is sized to the reactors and their peak load.
- Site. Land area and logistics for waste delivery and slag shipment.
How long does it take?
- Research and feasibility, about 6 months: waste audit, site, offtake and permits.
- Engineering and construction, 24–26 months depending on configuration.
Because the plant is modular, the first reactor can start while the next ones are being built, which brings the plant to full capacity faster.
What do we need to prepare a proposal?
- annual waste volumes by type: municipal, industrial, medical, toxic, landfill
- waste composition and moisture, if known
- candidate site and distance to the grid or heating network
Frequently asked questions
What is the smallest plant you can build?
The recommended minimum reactor capacity is 5 tonnes per hour. Most projects use at least two reactors so that maintenance does not stop the plant.
Can capacity be increased later?
Yes. Additional reactors can be added to a modular plant, and each reactor designed with reserve handles 30–40% above nominal load.
Who are the typical customers?
Municipalities, ministries of environment and health, pollution control departments and industrial companies with hazardous waste.
Related questions
How does molten slag bath treatment work?The furnace, step by step Incineration vs gasification vs plasmaWhich waste treatment is best? Nullogen FAQTechnology, safety and plants
Which configuration fits your region?
Send us your waste volumes, and we will prepare a plant configuration.
Figures are estimates from Nullogen project materials and depend on local conditions.